Danger! |
|
|---|---|
|
Operation
|
|
The modular system is designed as follows and is to be mounted on the DIN rail:
-
Central unit on the far left
-
Up to 15 modules to the right of the central unit
-
End cover on the far right to protect the contacts
Make sure that the modules
-
are properly secured to the DIN rail and
-
are correctly positioned in the side guide rails.
Check the correct fitting of the modules after mounting by a visual inspection.
Note |
|
|---|---|
|
An end cover is included in the scope of delivery of the central unit. The end cover is also available as an accessory or spare part from iba. |
|
Installation clearances
Ensure a minimum clearance of the entire system of 30 mm upwards and downwards and 10 mm to the right and left for sufficient ventilation of the device.