You can use the time period update task to write or update values from info fields in existing time periods. Creating new fields is not possible with this task. You can add the task to any time period job.

You configure the values to be updated in ibaAnalyzer. In ibaDatCoordinator, you then assign the PDO file containing the configuration of the info fields to be updated in the Analysis field.
For all other settings, see General task settings.
Note |
|
|---|---|
|
To be able to use this task, you need ibaAnalyzer v8.3.0 or higher. |
|
